Expansion of State Road 2008 between Lengenwang and Balteratsried: Construction Schedule and Detour Information
Project Overview: The State Road 2008 between Lengenwang and Balteratsried is set to undergo expansion, aiming to improve traffic flow, safety, and regional connectivity. The project includes widening the roadway, upgrading intersections, and enhancing pedestrian and cycling paths, with a focus on closing a gap in the cycle network along the state road.
Construction Schedule: - Start Date: Construction work on the road between Lengenwang and Sigratsbold will commence on August 18. Bridge construction at Sigratsbold will begin in March, and it will be slid into place in the fall. - Expected Completion: The project is expected to be completed by the end of December 2026. - Working Hours: Work will take place from Monday to Friday, 7 AM to 6 PM, with occasional weekend work if required. - Phases: The project will be divided into three phases: - Phase 1: Preliminary site preparation and utility adjustments (September 2025 – December 2025) - Phase 2: Road widening and pavement works (January 2026 – September 2026) - Phase 3: Finishing works including signage, markings, and landscaping (October 2026 – December 2026)
Traffic Impacts and Detours: - The road will be closed in sections, with at least one lane open at a time where possible. - Full closures may occur during certain phases, with detours signposted clearly. - Main detour routes will direct traffic via nearby regional roads, including Marktoberdorf, Roßhaupten, and Seeg, to minimize disruption. - Local access for residents and emergency services will be maintained throughout. - Public transport routes may experience minor modifications; please check local schedules.
Advice for Drivers and Residents: - Allow extra travel time when traveling through the construction zone. - Follow all posted signage and speed limits. - Use alternative routes if possible during peak construction phases. - Stay informed with updates from the local road authority or municipality.
For the latest updates, you may need to contact the regional transport department or visit their official website.
Additional Information: - The railway crossing in the north will be removed, and the economic path will be routed under the railway line. - Vocational schools for care and care assistance have celebrated their graduates, with 19 apprentices at Hörmann in Buchloe and the Technical School for Nutrition and Supply Management also holding graduation ceremonies. - The Free State of Bavaria is investing around 8.7 million euros in the traffic and cycle safety of this section. - A third construction phase with further road expansion and cycle path connection to the village road in Balteratsried is planned for the end of next year. - A new mobile tree concept is being discussed on the weekly market in Kaufbeuren. - The "Kreisbote" app provides daily news updates after work or about the most important stories.
- To facilitate the expansion of the State Road 2008 between Lengenwang and Balteratsried, finance from the Free State of Bavaria will be used, amounting to approximately 8.7 million euros.